Project Name | Company Name | Project Type | Pre-Bid Date | Bid Date | Bids In |
|---|
City of Van Wert, OH - Water Treatment Spray Aeration In general, the work consists of TTHM reduction equipment installed in an existing buried clearwell including, four mixers, four spray aerators, four ventilation blowers and the concrete structure to support the equipment; replacement of four slide gates at water supply reservoirs. | Jones & Henry Engineers, Ltd. (Cincinnati) | | 08/25/2026 01:00 PM ET | 09/17/2026 11:00 AM ET | 24 Days |
City of Willard, OH - Celeryville Wastewater Collection System Phase 1 - Contract 2 In general, the work consists of the construction of a gravity and low pressure sewer system in Celeryville with collected wastewater pumped to the City of Willard. A collection pump station will be constructed on the south end of the project area on the west side of SR-103 and the north side of Sharpless Ditch. The pump station will be a suction lift pump station. | Jones & Henry Engineers, Ltd. (Cincinnati) | | 08/04/2026 10:30 AM ET | 08/17/2026 11:00 AM ET | Bid Tab |
Village of Blanchester, OH - Reservoir 3 Improvements In general, the work consists of rebuilding the existing Reservoir 3 dam and spillway structure. The work includes, but is not limited to: demolishing and removing the existing concrete primary and overflow spillways, and reservoir drain; removing existing tree stumps and roots, and vegetation; removing topsoil and non-clayey soil; compacting existing dam soil rebuild dam to grade; construct new 24 inch drain and associated structures; construct new concrete spillway; construct new stone rip rap on reservoir side and spillway side; and finish grade seed and mulch disturbed soil and dam soil. | Jones & Henry Engineers, Ltd. (Cincinnati) | | 07/28/2026 10:00 AM ET | 08/21/2026 01:00 PM ET | Post Bid |
Village of Oak Harbor, OH - Wastewater Treatment Plant Improvements - Rebid In general, the work consists of construction of a head works treatment process including screening and raw sewage pumping; plant electrical and controls in a stand-alone building; grit removal, new Orbal oxidation ditch, two new secondary clarifiers, new ultraviolet disinfection and meter flume with outfall to the Portage River. Replace the sludge dewatering press and support equipment in an existing building. The improvements will also include upgrade of support services such as heating, ventilation, plumbing, electrical, instrumentation and controls and SCADA. Portions of the existing plant are planned to be demolished as an alternate the work. | Jones & Henry Engineers, Ltd. (Toledo) | | | 09/24/2026 02:00 PM ET | 31 Days |
Village of West Unity, OH - South Liberty Pump Station Removing the existing pump station and installing a new pump station | Jones & Henry Engineers, Ltd. (Toledo) | | | 08/28/2026 02:00 PM ET | 4 Days |