Project Name | Company Name | Project Type | Pre-Bid Date | Bid Date | Bids In |
|---|
City of Van Wert, OH - Water Treatment Spray Aeration In general, the work consists of TTHM reduction equipment installed in an existing buried clearwell including, four mixers, four spray aerators, four ventilation blowers and the concrete structure to support the equipment; replacement of four slide gates at water supply reservoirs. | Jones & Henry Engineers, Ltd. (Cincinnati) | | 08/25/2026 01:00 PM ET | 09/17/2026 11:00 AM ET | Bid Tab |
Turkey Creek Regional Sewer District - Enchanted Hills Meter Pits Installation In general, the work consists of furnishing and installing 70 meter pits to replace existing water shut off valves. | Jones & Henry Engineers Ltd. (Ft. Wayne) | | 10/08/2026 10:00 AM ET | 10/22/2026 10:00 AM ET | 20 Days |
Village of Antwerp - New Water Treatment Plant Demolition of existing water treatment plant and construction of a new 600 gallon per minute water treatment plant. | Jones & Henry Engineers, Ltd. (Cincinnati) | | 10/20/2026 01:00 PM ET | 11/12/2026 03:00 PM ET | 41 Days |
Village of Oak Harbor, OH - Wastewater Treatment Plant Improvements - Rebid In general, the work consists of construction of a head works treatment process including screening and raw sewage pumping; plant electrical and controls in a stand-alone building; grit removal, new Orbal oxidation ditch, two new secondary clarifiers, new ultraviolet disinfection and meter flume with outfall to the Portage River. Replace the sludge dewatering press and support equipment in an existing building. The improvements will also include upgrade of support services such as heating, ventilation, plumbing, electrical, instrumentation and controls and SCADA. Portions of the existing plant are planned to be demolished as an alternate the work. | Jones & Henry Engineers, Ltd. (Toledo) | | | 11/05/2026 02:00 PM ET | 34 Days |