Jones & Henry Plan Room: Construction Jobs for Bid

HeaderHeader
Project NameCompany NameProject TypePre-Bid DateBid DateBids In
City of Willard, OH - Celeryville Wastewater Collection System Phase 1 - Contract 2
In general, the work consists of the construction of a gravity and low pressure sewer system in Celeryville with collected wastewater pumped to the City of Willard. A collection pump station will be constructed on the south end of the project area on the west side of SR-103 and the north side of Sharpless Ditch. The pump station will be a suction lift pump station.
Jones & Henry Engineers, Ltd. (Cincinnati)08/04/2026 10:30 AM ET08/10/2026 11:00 AM ET
12 Days
Village of Blanchester, OH - Reservoir 3 Improvements
In general, the work consists of rebuilding the existing Reservoir 3 dam and spillway structure. The work includes, but is not limited to: demolishing and removing the existing concrete primary and overflow spillways, and reservoir drain; removing existing tree stumps and roots, and vegetation; removing topsoil and non-clayey soil; compacting existing dam soil rebuild dam to grade; construct new 24 inch drain and associated structures; construct new concrete spillway; construct new stone rip rap on reservoir side and spillway side; and finish grade seed and mulch disturbed soil and dam soil.
Jones & Henry Engineers, Ltd. (Cincinnati)07/28/2026 10:00 AM ET08/14/2026 01:00 PM ET
16 Days
Village of West Unity, OH - South Liberty Pump Station
Removing the existing pump station and installing a new pump station
Jones & Henry Engineers, Ltd. (Toledo)08/28/2026 02:00 PM ET
30 Days