Project Name | Company Name | Pre-Bid Date | Bid Date | Bids In |
|---|
Medina County Chippewa and Lake Road Water Main Replacement Informational Posting Only | Jones & Henry Engineers, Ltd. (Toledo) | | 05/07/2026 01:30 PM ET | Post Bid |
Northwestern Water & Sewer District - East Union Street Water Main Replacement Informational Posting Only | Jones & Henry Engineers, Ltd. (Toledo) | | 05/07/2026 11:30 AM ET | Post Bid |
Northwestern Water & Sewer District - Rossford Jennings Road Sanitary Sewer Rehabilitation Informational Posting Only | Jones & Henry Engineers, Ltd. (Toledo) | | 05/07/2026 11:00 AM ET | Post Bid |
Village of Cassopolis - Interceptor Force Main Replacement Project In general, the work consists of the replacement of approximately 25,000 feet of force main from along the Village of Cassopolis’ existing force main interceptor route that runs from State Highway 62 to Peavine St, Peavine St to Cherry Grove Rd, and E Division St to N Mill St. In addition, the work will include the replacement and lining of sanitary sewer manholes along this same route. The force main and manhole work shall also include new manholes, air release valves and structures, backflow structure, and surface restoration of disturbed areas. | Jones & Henry Engineers, Ltd. (Kalamazoo) | | 06/19/2026 02:00 PM ET | 23 Days |
Village of Oak Harbor, OH - Wastewater Treatment Plant Improvements In general, the work consists of construction of a head works treatment process including screening, raw sewage pumping plant electrical and controls; new Orbal oxidation ditch treatment process including grit removal, two new secondary clarifiers, new ultraviolet disinfection treatment and meter flume with outfall to the Portage River. The solids handling of the plant include modifications to the existing blower building, existing digester building, installation of a new sludge feed pump and a new sludge dewatering building with truck loading. The improvements will also include support services such as heating ventilation, plumbing, electrical, instrumentation and controls and SCADA. The existing plant is planned to be demolished as a part of the work. | Jones & Henry Engineers, Ltd. (Toledo) | | 06/04/2026 02:00 PM ET | 8 Days |