Jones & Henry Plan Room

HeaderHeader

Village of Oak Harbor, Ohio

Premier Partner Program

Village of Oak Harbor, Ohio

Contact

Company Contact

Jones & Henry Engineers, Ltd. (Toledo)
Kyle Brueggemeier
Contact

Location


Contact

Pre-Bid Information

02/05/2020 09:00 AM
A pre-bid conference will be held at 9:00 a.m. local time on February 5, 2020 at the Village of Oak Harbor Municipal Building, Council Chambers, 146 North Church Street. Attendance at the pre-bid conference is highly encouraged but is not mandatory.
Contact

Bid Information

02/20/2020 11:00 AM
Sealed Bids for the construction of the Church Street Combined Sewer Separation Improvements will be received by the Village of Oak Harbor, at the Municipal Building Fiscal Office, 146 North Church Street, PO Box 232, until 11:00 a.m. local time on February 20, 2020, at which time the Bids received will be publicly opened and read. The Project consists of a new storm sewer to be installed in Church Street from South Railroad to a new outlet to the Portage River, on the East side of the U.S. Bank. A connector storm sewer is also being installed in Main Street from Church Street to Locust Street. The existing combined sewer is being removed. A new sanitary sewer is being installed on Church Street parallel to the storm sewer as part of separating the existing Church Street combined sewer. The Project also includes replacing water main and the total reconstruction and widening of the asphalt road on Church Street. The Project consists of constructing approximately 8,600 lineal feet of 6-inch to 84-inch storm sewer; 9,100 lineal feet of 6-inch to 21-inch sanitary sewer; 360 lineal feet of 60-inch and 48-inch by 76- inch horizontal elliptical outfall sewer; 3,500 lineal feet of water line replacement; and 2 headwalls on the Portage River.

Bid Categories

Bidder
Subcontractor/Supplier
Planroom(NON-BIDDER)
(C) Eastern Engineering Use Only

Job Purchase Information:

Downloadable and Printed Sets of Bidding Documents may be ordered per the options listed on the Order page (plus $14 Processing Fee/ECO Fee, and Shipping/Delivery and Tax when applicable). Credit Card or Eastern Engineering Charge Account required (before printing) for purchases.

If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set - see Spec Sheets tab) are paid to Eastern Engineering and are posted on the Spec Sheets tab.

Reference files will be available soon.

PLEASE NOTE - IF YOU ORDER ONLY THE FREE DOWNLOADS FOR THIS JOB, IGNORE THE CHARGES THAT APPEAR AND BE SURE TO SELECT ''NO DEPOSIT/NO CHARGE'' AS YOUR PAYMENT OPTION.

Addenda